21/11/2026
Saudi fuel station requirements 1445H for existing stations - Fuelax

By the Fuelax team · Last updated: 21 November 2026

Short answer: The Permanent Executive Committee for Service Centers and Fuel Stations issued the 1445H (2023) requirements, with an annex for existing stations. The general rule: existing stations must comply within 12 months of issuance, except for location and distance rules, with longer periods for specific items such as leak detection, vapor recovery and multi-product dispensers.

What is the latest version of the requirements?

The latest version we found on the Ministry of Municipalities and Housing website is the Fuel Stations and Service Centers Requirements, 1445H (2023). Many people search for a "1447 regulation"; check with the municipality or the Balady platform in case an update was issued after this article.

What are the fuel station categories?

CategoryDescriptionMinimum area
AOutside urban boundaries on regional roads: A1 on main and secondary roads, A2 on sub-regional roadsNo set minimum
BInside urban boundaries, fuel with essential and optional servicesAbout 500 m² for two pumps with no extra services
CCompact stations: tank and pump inside a metal enclosure, limited optional servicesPer table (1-3)
DMobile stations: tank and pump on a truckSeparate rules

Category B stations sit on two streets: the main one at least 30 m wide and the secondary at least 10 m; access from the secondary street is allowed only if it is 20 m or wider.

What must existing stations do?

The corrective-periods annex covers stations already built or under construction with tanks and pumps installed, and existing stations making a significant modification such as replacing tanks or pumps. Required items include:

ItemRequirement
Operation, management and maintenanceThrough qualified facilities; the deadline was 31/12/2024
Manager room, staff rest area and restroomsIn category A and B service centers
Highway access (category A)Service road of at least 1 km, plus deceleration and acceleration lanes per Ministry of Transport rules
Information sign (category A)At least 10 km before the station, showing distance, status and fuel availability
Leak detection and containmentLeak detector per SBC-801 Article 23, and a containment sump under each dispenser
Tank gaugingAutomatic tank gauge, and 110% containment for above-ground tanks
Vapor recoveryPhase I for tanks over 5 m³ and tankers; Phase II for stations selling over 75,000 liters/day or near sensitive receptors
Multi-product dispensersAt least 3 (91, 95, diesel) within two years in categories A, B and C; others replaced at the end of their 7-year life
Diesel for light vehiclesDiesel dispensers under the canopy per the Ministry of Energy plan
Price signLit tower sign at the entrance, official price per fuel including VAT, at least 4.5 m high

Periods in the annex table (12, 24 or 36 months, or upon modification) differ by item. Check with the municipality for what applies to your station.

How do you upgrade your station step by step?

  1. Technical assessment: tanks, leak detection, dispensers, electrical and fire systems against the annex items.
  2. License review: municipal license, Civil Defense requirements and the Ministry of Energy facility qualification.
  3. Corrective plan: order items by deadline, then safety, then appearance and services.
  4. Design: a layout matching the station category: access, circulation, canopy, price sign and essential services.
  5. Budget: detailed quotes per item, with a reserve for underground works.
  6. Phased execution: start with work that does not touch the pumps, then dispensers in batches if safety allows.
  7. Reopening: update the station details and photos on Google Maps and tell customers in the area.

After the upgrade: run it yourself or with a brand?

OptionSuitsRead
Self-operationOwners with operating experience and a teamFuel station management
Franchise of a known brandOwners who want a brand, operating system and marketing support while keeping ownershipConvert your station to a Fuelax franchise
Lease to an operatorOwners who want steady income without daily managementLeasing a fuel station

Since the requirements call for operation through qualified facilities, many owners turn to an operator or brand that holds the qualification. Fuelax holds the Ministry of Energy facility qualification and grants its franchise to existing and new stations.

FAQ

What are the new fuel station requirements in Saudi Arabia?

The latest version on the ministry website is the 1445H (2023) edition. It defines four categories, essential and optional services, safety and environmental rules, and corrective periods for existing stations.

Do the new requirements apply to my existing station?

Yes. The annex requires existing stations to comply within 12 months of issuance, except location and distances, with specific periods for some items. A significant modification such as replacing tanks or pumps requires a corrective plan.

How much land do I need for a fuel station?

About 500 m² for a category B urban station with two pumps and no extra services; more for each service. Category A stations outside cities have no set minimum.

Do the CR and municipal license stay in my name under a Fuelax franchise?

Yes, they stay in the franchisee's name.

About Fuelax

Fuelax is the brand of Commercial Energy Services Company, a Saudi company based in Riyadh with more than 30 years in operating and developing fuel stations and service centers, and a network of 101 stations across the Kingdom. It holds ISO 9001:2015 and ISO 45001 certificates and the Ministry of Energy facility qualification certificate. Contact: 920035789 (call or WhatsApp).

Sources